ALUMINIUM RESEARCH INSTITUTE
1985 – 1987, NOVARA, ITALY
The initial assignment was to study multifunctional facades that could be mass produced.
The objective was to build a protoype led to the larger idea of using aluminum in every possible way for an entire building.
Further research into using aluminum in a modular way yielded a building that could be assembled in the space of four months only.